Eagle adds sign to wallby Nathan Arneal Above is the finished product of over a month's worth of on-and-off work on the south wall of the North Bend Eagle building. Read more in the Eagle story here. Final touch ups were done Nov. 7, 2021, just in time to beat the cold. The sign is nearly three stories above ground level and can be seen when driving north down Main Street. The E and some striping was done Sept. 28. Painting of the black background started Sept. 23. The above "before" picture was taken Sept. 23 right before painting started.
<<Back to the front page |
|